top of page

PUMP AND LIFT

What We Do and How We Do it

Services: Services
IMG_4320.HEIC

STEP 1 - DRILL

First, we drill holes through the concrete slab in order to reach the cavities below.

STEP 2 - PUMP

Now that our holes are drilled, we begin to pump a mixture of soil and cement into the holes at high pressure in order to lift the slab.

IMG_4326_edited.jpg
IMG_4341_edited.png

STEP 3 - PATCH

The final step is to seal and patch the holes with cement.

Mtn. Green Job.HEIC

Before

IMG_4658.HEIC

After

Services: Testimonials
AR B1.jpg

Before

AR A1.jpg

After

Services: Testimonials
TS B1.jpg

Before

TS A1.heic

After

Services: Testimonials
bottom of page